Day 1
- Barbell Overhead Press1 × 5 · 58% TM1 × 5 · 67% TM1 × 5+ · 76% TMBack-off 5 × 10 · 50% TM
- Chin-Up5 × 10
- EZ Bar Skullcrusher5 × 10 · 20 kg
Volume-focused 5/3/1 variant pairing heavy main work with 5x10 supplemental sets for size and strength.
Copy it to your plans in the free app. TopSet works out each set’s target weight from your training max or 1RM.
Download on the App StoreJim Wendler's most popular 5/3/1 template for building muscle. Each session pairs the standard 5/3/1 progression on one main barbell lift with 5 sets of 10 reps of the same lift at a lighter weight, then finishes with minimal assistance work. The high-rep supplemental sets drive hypertrophy while the heavy main work maintains and builds strength.
Boring But Big (BBB) is a supplemental template for Jim Wendler's 5/3/1 system, published on his blog and later expanded in his books Beyond 5/3/1 and 5/3/1 Forever. Wendler — a former Westside Barbell trainee who squatted 1,000 lbs — created BBB to add a straightforward hypertrophy component to 5/3/1.
The philosophy is brutally simple: after your heavy main work, hammer the same movement pattern with high-rep sets at moderate weight. No complicated exercise selection, no fancy periodization for accessories. Just pick up the bar and do 50 reps. The name is literal — it's boring, but it works.
Pros
Cons
Each day focuses on one of the four main barbell lifts: Overhead Press, Deadlift, Bench Press, and Squat. These are the only exercises that follow the 5/3/1 progression and receive BBB supplemental volume.
The BBB supplemental work uses the same lift as the main work. Wendler's reasoning: the best way to get better at a lift is to do more of that lift. Doing Bench Press for 5x10 after your heavy bench work gives you 80 total reps of benching per week (when including warm-ups), which is significantly more practice than most programs provide.
Assistance work follows Wendler's push/pull/core template with two exercises per session. Each day pairs one pulling or arm exercise with one arm or core exercise:
These can be freely swapped for any similar exercise.
Main 5/3/1 work follows the standard wave. In the original program, percentages are based on a Training Max (TM = 90% of 1RM). In this Liftosaur implementation, percentages are expressed as % of 1RM directly (pre-converted from TM), so you just need to set your 1RM:
The final set each week is AMRAP — do as many reps as possible while keeping good bar speed. Stop when the bar slows significantly or form breaks down. Don't grind to absolute failure.
BBB supplemental work: 5 sets of 10 reps at 50% of 1RM. This weight should feel manageable for the first 2 sets and challenging by sets 4-5. If you can't complete all 50 reps, the weight is too heavy.
Deload week: All sets drop to 36-54% of 1RM with no AMRAP, and BBB volume drops to 40% of 1RM. This recovery week is essential — don't skip it.
Assistance work: 5 sets of 10 reps each for one pull and one arm or core exercise. These are done at light-to-moderate effort, not to failure.
After completing each 3-week working cycle (before the deload), increase your 1RM:
These increments are fixed and apply to your 1RM, which shifts all percentage-based weights up slightly. The slow progression is by design — Wendler's rule is "start too light" and let the weights build over months.
When you stall: If you can't hit the prescribed minimum reps on your AMRAP sets for a full cycle (e.g., getting only 3-4 reps on the 5+ set, or failing the 1+ set entirely), your weights are too heavy. Reduce your 1RM by 10-15% and rebuild.
Deload: Every 4th week. Use lighter weights (36-54% of 1RM) and no AMRAP sets. Don't skip deloads — the BBB volume accumulates fatigue that needs periodic dissipation.
Run BBB for 3-6 cycles (12-24 weeks). It's a template you can return to repeatedly — many lifters cycle between BBB and lower-volume templates like FSL or SSL.
Signs it's time to switch: You're dreading the 5x10 sets every session (mental burnout), recovery is suffering despite adequate sleep/food, or you want to prioritize absolute strength over hypertrophy.
Transition to: BBB 3-Month Challenge (ramps BBB weight from 50% to 70% TM over 3 cycles for more advanced lifters), 5/3/1 Building the Monolith (higher volume, more variety), or 5/3/1 First Set Last (lower volume, better for cutting or recovery phases). Any 5/3/1 template from 5/3/1 Forever works as a follow-up.
Barbell, squat rack, bench, weight plates, and a pull-up bar for the main lifts and pulling accessories. A pair of dumbbells or an EZ bar for arm isolation work (Skullcrusher, Triceps Extension, Bicep Curl, Hammer Curl).
Home gym substitutions:
If you don't know your 1RM: Work up to a weight you can do for 3-5 clean reps. Use Brzycki's formula: 1RM = weight / (1.0278 - 0.0278 x reps). Or just use the Liftosaur 1RM calculator.
Common mistake: Setting your 1RM too high. Wendler's core principle is "start too light." If your AMRAP set on Week 1 (5+ day) only gives you 5 reps, your 1RM is probably inflated — you should be getting 7-8+ reps on that set when properly calibrated.
BBB is an intermediate program — you need 1-3 years of experience and solid technique on squat, bench, deadlift, and overhead press. The 5x10 supplemental sets demand good form under fatigue. Start with 5/3/1 for Beginners if you're newer to lifting.
It's a 4-day program, typically Monday/Tuesday/Thursday/Friday. Each day focuses on one main barbell lift (OHP, deadlift, bench press, or squat) followed by 5x10 of the same lift and two assistance exercises.
The defining feature is the 5x10 supplemental sets at 50% of 1RM after your heavy 5/3/1 work. This gives you 50 additional reps of each main lift per session, making it one of the most effective templates for building muscle while maintaining strength.
After each 3-week working cycle, increase your 1RM by 5 lbs for overhead press and bench press, and 10 lbs for squat and deadlift. Every 4th week is a mandatory deload. The BBB supplemental weight stays at 50% of 1RM throughout.
Not recommended. The 5x10 sets create significant fatigue that requires adequate caloric surplus and sleep to recover from. If you're cutting, use a lower-volume template like 5/3/1 First Set Last (FSL) instead.
Run it for 3-6 cycles (12-24 weeks). Many lifters cycle between BBB and lower-volume templates throughout the year. Move on when you're dreading the 5x10 sets every session, recovery is suffering, or you want to prioritize absolute strength over hypertrophy.
Program by Jim Wendler. TopSet is not affiliated with or endorsed by the program’s creator. Program names and trademarks belong to their owners. See the guide for original sources.