Day 1
Workout A (quads & back)
- Barbell High Bar Squat1 × 8 · 60 kg
- Cable Lat Pulldown1 × 6 · 32.5 kg
Ultra-minimalist HIT program — just 2 exercises per workout, 1 set each to absolute failure, trained once per week.
Copy it to your plans in the free app. TopSet works out each set’s target weight from your training max or 1RM.
Download on the App StoreWorkout A (quads & back)
Workout B (posterior chain & chest/triceps)
Mike Mentzer's Consolidated Routine is the most extreme expression of High Intensity Training (HIT) ever devised. Just 4 total exercises split across 2 workouts, with 1 working set per exercise taken to absolute muscular failure, alternated once per week. Published in Heavy Duty II in the late 1990s, it represents Mentzer's answer to the question: "What is the minimum amount of training required to stimulate maximum muscular growth?"
Mike Mentzer (1951–2001) developed the Consolidated Routine as the final evolution of his Heavy Duty training system, published in Heavy Duty II in the late 1990s. Where Mike Mentzer's Heavy Duty used pre-exhaust supersets across 5-6 exercises per session 3 days per week, the Consolidated Routine strips training to the absolute bare minimum: 2 compound exercises per workout, 1 working set each, performed once per week.
The theoretical foundation is Mentzer's concept of the Indirect Effect: heavy compound movements trigger a systemic hormonal and neurological response that stimulates growth throughout the entire body, not just the muscles directly worked. A maximal set of deadlifts doesn't just grow your posterior chain — it triggers growth in your arms, shoulders, and chest through systemic mechanisms. This is why, in Mentzer's view, isolation exercises are unnecessary: they add recovery cost without meaningful additional stimulus.
Mentzer's guiding principle: "More exercise beyond what is minimally required is not only unnecessary — it's counterproductive." As trainees grow stronger and handle heavier loads, they don't need more training — they need less.
Pros
Cons
Workout A: Squat is the primary lower body push — Mentzer considered it the most productive exercise for overall systemic growth stimulus, working quads, glutes, and core. Lat Pulldown with a close underhand (palms-up) grip provides the upper body pull — Mentzer specified this grip to simulate chin-ups with greater control and lat emphasis, also hitting biceps indirectly.
Workout B: Deadlift is the primary lower body pull — it provides the strongest possible posterior chain stimulus and the greatest systemic hormonal response of any exercise, hitting glutes, hamstrings, lower back, traps, and grip. Triceps Dip is the upper body push — Mentzer called this "the upper body squat" because it hits chest, triceps, and anterior deltoids in one movement with heavy loads.
The pairing logic is deliberate: each workout balances a push with a pull, and lower body with upper body. Squat (legs/push) pairs with Lat Pulldown (upper/pull); Deadlift (legs/pull) pairs with Triceps Dip (upper/push).
Substitutions: Leg Press can replace Squat. Chin Up can replace Lat Pulldown if you have a pull-up bar but no lat pulldown machine. Bench Press Close Grip can replace Triceps Dip if you don't have a dip station.
Every exercise is performed for 1 working set to absolute muscular failure:
Mentzer prescribed a controlled rep tempo: approximately 2-4 seconds concentric, brief pause at peak contraction, 4-5 seconds eccentric. No momentum, no bouncing, no cheating. Perform 1-3 warm-up sets at lighter weights before each exercise, never approaching failure on the warm-ups.
Double progression within each rep range:
When you stall: If you are not stronger (more reps or more weight) at every single workout, you are not yet recovered. Add more rest days between sessions. Do not add more volume. Some trainees on this program eventually train as infrequently as once every 10-14 days per workout.
Run the Consolidated Routine for 6-12 weeks. Signs it's working: you're setting rep or weight PRs at every session. Signs it's time to move on:
Transition to Mike Mentzer's Heavy Duty for more exercise variety while staying within HIT principles, or to 5/3/1: Boring But Big for higher volume and submaximal training.
For a home gym with just a barbell and pull-up bar: replace Lat Pulldown with Chin Up and Triceps Dip with Bench Press Close Grip.
No. The Consolidated Routine requires advanced training maturity — you must know how to push to true absolute muscular failure with perfect form on heavy compound lifts. Beginners should start with a structured beginner program and train for at least 1-2 years before attempting this level of intensity with this little volume.
Mentzer and many practitioners report significant muscle and strength gains on once-per-week training. The key is that each set must be a true all-out maximal effort. Some research supports that even low-volume training can produce hypertrophy, though most evidence suggests higher volume (10-20 sets per week per muscle group) produces better results for most people.
Heavy Duty (the Ideal Routine) uses 5-6 exercises per session with pre-exhaust supersets, 3 days per week — about 15 total working sets across 3 workouts. The Consolidated Routine uses just 2 exercises per session, 1 set each, once per week — 2 total working sets per workout. The Consolidated Routine is the final, most extreme evolution of Mentzer's HIT philosophy.
Exactly 1 working set per exercise, taken to complete muscular failure. That's 2 working sets per workout total. You should also perform 1-3 warm-up sets per exercise at lighter weights, but these warm-up sets must never approach failure — they exist only to prepare joints and the nervous system.
Add more rest days between workouts. If you're training once per week and not progressing, try once every 10-14 days. Do not add more exercises or sets — Mentzer was adamant that staleness means you need more recovery, not more stimulation. If extending rest still doesn't help after several weeks, transition to a different program.
You can, but doing so changes the program's nature. Some sources describe a 3-exercise variant that adds an overhead press and calf raises. If you want significantly more exercise variety while staying within HIT principles, run Mike Mentzer's Heavy Duty (the Ideal Routine) instead, which includes pre-exhaust supersets and isolation exercises.
Including warm-up sets and rest between exercises, expect the full session to take 15-25 minutes. The actual working volume is just 2 sets to failure — most of your gym time is spent warming up. This is one of the shortest workout programs ever designed.
Program by Mike Mentzer. TopSet is not affiliated with or endorsed by the program’s creator. Program names and trademarks belong to their owners. See the guide for original sources.