Group A Day 1
- Barbell High Bar Squat3 × 5 · 20 kg
- Barbell Bench Press3 × 5 · 20 kg
- Barbell Conventional Deadlift1 × 5 · 42.5 kg
Beginner barbell program, Phase 3 — chin-ups added, deadlifts and power cleans alternate
Copy it to your plans in the free app. TopSet works out each set’s target weight from your training max or 1RM.
Download on the App StoreGroup A Day 1
Group B Day 1
Group A Day 2
Group B Day 2
Group A Day 1
Group B Day 1
Group A Day 2
Group B Day 2
Group A Day 1
A beginner barbell program and the advanced novice phase of Starting Strength. Chin Up added for upper body pulling volume. Deadlift and Power Clean alternate within Workout A, creating a four-workout rotation. Microloading (2.5lb jumps) typically needed for Overhead Press and Bench Press at this stage.
Starting Strength was created by Mark Rippetoe, a competitive powerlifter and strength coach based in Wichita Falls, Texas. The program is detailed in his book Starting Strength: Basic Barbell Training, first published in 2005 and now in its 3rd edition (2011). The companion book Practical Programming for Strength Training covers the programming theory behind the novice progression.
The core philosophy: beginners can add weight to the bar every single session for months — the "Novice Effect." Rather than waste this window on machines or complicated periodization, Starting Strength exploits it with a handful of barbell movements, linear loading, and full recovery between sessions. Strength is treated as the most fundamental physical adaptation — muscle size, power, and endurance all improve as side effects of getting stronger.
Pros
Cons
The press/bench alternation and the deadlift/power clean alternation are now independent of each other. This creates 4 distinct workouts:
| Workout | Lift 1 | Lift 2 | Lift 3 |
|---|---|---|---|
| A1 | Squat | Bench Press | Deadlift |
| B1 | Squat | Overhead Press | Chin Up |
| A2 | Squat | Overhead Press | Power Clean |
| B2 | Squat | Bench Press | Chin Up |
A sample 3-week rotation training Mon/Wed/Fri:
| Monday | Wednesday | Friday | |
|---|---|---|---|
| Week 1 | A1 | B1 | A2 |
| Week 2 | B2 | A1 | B1 |
| Week 3 | A2 | B2 | A1 |
Squat still leads every session — by Phase 3, your squat technique is solid and the weight is heavy enough that you need to be fresh for it.
Bench Press and Overhead Press continue to alternate, but now across a 4-workout cycle instead of 2. Each pressing movement is trained roughly 1x/week. This is lower frequency than Phase 2, but at this stage the weights are heavy enough that more recovery between pressing sessions is beneficial.
Deadlift and Power Clean now both appear only on A-days, alternating between them. This further reduces deadlift frequency (from every A-day in Phase 2 to every other A-day here), which is necessary because deadlift weights are now very heavy relative to the lifter's capacity.
Chin Up is the new addition, appearing on all B-days. It fills a gap in the program — until now there was no direct upper back pulling work besides deadlifts and cleans. Chin-ups build the lats, biceps, and forearms, and the strength carries over to deadlift lockout and bench press stability.
Substitutions: If you can't do Chin Up for 3 sets of 10, use Lat Pulldown (3x10) or band-assisted chin-ups until you build enough strength. If still substituting Bent Over Row for Power Clean, that continues to work here.
Weight increases per session:
| Lift | Increase |
|---|---|
| Squat | +5lb |
| Deadlift | +5lb |
| Bench Press | +2.5lb (microloading) |
| Overhead Press | +2.5lb (microloading) |
| Power Clean | +2.5lb (microloading) |
| Chin Up | +2.5lb (once doing weighted chin-ups) |
Phase 3 is where microloading becomes essential for upper body lifts. You'll need fractional plates (1.25lb each side) to make 2.5lb total jumps. Without them, you'll stall much sooner on Overhead Press and Bench Press.
When you stall (can't complete all prescribed reps for 2 consecutive workouts on the same lift):
Each lift is tracked independently. You may finish linear progression on Overhead Press months before Squat. Only change programming for the lifts that have truly stalled.
Run Phase 3 until linear progression is exhausted — typically several weeks to a couple months after entering this phase. Total time on the Starting Strength novice program (all phases combined) is usually 3–9 months.
Signs it's time to move on: You're deloading repeatedly on Squat and Deadlift despite good sleep and nutrition. Multiple lifts have stalled through 2–3 deload cycles.
Good next programs:
If doing Power Clean, bumper plates and a platform are ideal but not strictly required.
Rest as long as needed to complete the next set. At Phase 3 weights, you'll need the full rest periods — don't rush.
If transitioning from Phase 2, continue with your current weights on all existing lifts. Start Chin Up at bodyweight (0lb added).
If starting the program fresh in Phase 3 (not recommended — start from Phase 1), use this method for each exercise:
Yes, Phase 3 is the advanced novice phase — the final stage before transitioning to an intermediate program. It adds chin-ups and creates a 4-workout rotation. Total time on all Starting Strength phases combined is usually 3-9 months.
It's still a 3-day program on non-consecutive days (typically Mon/Wed/Fri), but now with a 4-workout rotation instead of Phase 2's simple A/B alternation. The four workouts cycle continuously, shifting the pattern each week.
Phase 3 adds chin-ups on all B-days for upper body pulling volume, and deadlifts and power cleans now alternate within A-days (instead of being fixed to specific workouts). Microloading (2.5lb jumps) becomes essential for upper body lifts.
Yes, microplates (1.25lb each side for 2.5lb total jumps) are essential at this stage. Without them, you'll stall much sooner on overhead press and bench press. Most gyms don't stock these — buy your own.
The natural continuation is the Texas Method (weekly periodization with volume/recovery/intensity days). Other good options include Madcow 5x5 (weekly progression with ramping sets), 5/3/1 for Beginners (monthly periodization), or GZCLP (tiered approach with more variety).
Move on when you're deloading repeatedly on squat and deadlift despite good sleep and nutrition, and multiple lifts have stalled through 2-3 deload cycles. You may finish linear progression on overhead press months before squat — only change programming for lifts that have truly stalled.
Program by Mark Rippetoe. TopSet is not affiliated with or endorsed by the program’s creator. Program names and trademarks belong to their owners. See the guide for original sources.